The well was brought into production on 1 April and is currently producing at a stable dry oil rate of more than 1000 bpd on a restricted choke.
The well was drilled to a total measured depth of 5679 m and has penetrated 689 m of the Epsilon sandstone reservoir, in line with pre-drill expectations. Energean will continue to monitor and fine-tune production parameters to ensure optimal production from the well.
The EA-H3 well was drilled using the Company-owned drilling rig, the ‘Energean Force’.




