The backlog for the firm portion of the contract is expected to be approximately US$26 million. The West Saturn will be upgraded with a managed pressure drilling system, which is expected to be utilised as part of the upcoming workscope. The Saturn represents the fifth unit managed by Seadrill equipped with managed pressure drilling equipment.

Anna Nicklin
Assistant Editor
Anna joined Palladian Publications in July 2016 and is currently working as an assistant editor on Hydrocarbon Engineering magazine. She is excited at the prospect of enhancing her industry knowledge through this role.
Anna recently graduated from the University of Nottingham with a first class BA (Hons) degree in English and Philosophy, where she spent much of her time editing articles for a student magazine.
Currently living in Camberley, Anna enjoys cooking, exercising and travelling in her spare time.



