That drill program intersected two identified gas reservoirs, C1 and C2, in the Medium-Upper Pliocene sands of the Porto Garibaldi Formation.
The thickest level C2 (net pay 25.5 m) reported a peak flow rate of 148 136 sm3/d on a 3/8 in. choke and a pressure differential of 11 bar with no water production. Pressure recovery to formation pressure occurred in 2 minutes. The higher level C1 (net pay 15.5 m) also reported strong flow test results with a peak flow rate of 129 658 sm3/day on a 3/8 in. choke with good pressure recovery (about 12 minutes).




