The primary objective of the Manora-8 well is to explore for hydrocarbons in the 600 series sands that are the primary producing sands in Manora. The well targets a 3-way dip closure of the Manora Footwall A prospect in the upthrown (footwall) side west of the Manora Central block.

The planned TD of the well is 6420 ft TVDSS.