Activity onsite is minimal and includes road works, installing water monitoring bores as required by regulation, and safely packing down the rig and moving it to the side of the lease now that drilling has been successfully completed.
Tags:Upstream newsExploration newsUpstream drilling newsShale newsUpstream project newsOil & gas news

Nicholas Woodroof
Editor
Nick joined Palladian Publications in January 2018 after graduating from the University of Edinburgh with a degree in History, including a year abroad at the University of Delhi. After an enjoyable stint as Digital Editorial Assistant, he is now the Editor of Oilfield Technology and World Fertilizer.
Outside of work Nick enjoys cross-country running, whipping up the occasional curry and travelling.



