As previously announced, the first well, H18E N4, which is expected to be designated GY-682 at spud, is targeting a net 200 ft thick Mayaro Sandstone pay interval at a depth between 300 and 1000 ft depth and the well is anticipated to be completed for production immediately after drilling operations are concluded.