KM-02 produced from a 35 m interval of the C sand reservoir. The well flowed at a maximum rate of 120 million ft3/d of natural gas, limited only by the capacity of the surface equipment. Performance modelling confirms that the well is capable of delivering at the 300 million ft3/d design capacity when connected to the FPSO.