- Reduces rig-up time up to 75% for safer, more efficient operations.
- Enables storage on rig due to compact design and lower weight.
- Adapts to standard coil or wireline lift frames for maximum versatility.
- Eliminates capital expenditure by offering a rental option.
“We partnered with a major operator to bring this innovative, DNV-certified solution to the deepwater market,” stated Patrick Placer, President and COO, PRT Offshore. “The ILC expands our offshore “Hook to Hanger” rental fleet by adding a passive compensation option for vessels equipped with active heave drawworks.” The ILC features a 750T static capacity with 600T compensating capacity and 15-foot compensating stroke, making it ideal for deepwater completion and well intervention projects.




