
Appraisal and flow test completed at Tambak-1 well
The drill stem test flowed dry gas from the intra-Muda sands at a rate of 11.4 million ft3/d on a 181/64-in. (2.8 in.) choke, maintaining a wellhead tubing pressure of 225 psi.
Browse the latest drilling & production news and articles.

The drill stem test flowed dry gas from the intra-Muda sands at a rate of 11.4 million ft3/d on a 181/64-in. (2.8 in.) choke, maintaining a wellhead tubing pressure of 225 psi.

Over 200 dedicated engineering specialists are currently part of Lloyd’s Register's wells engineering and project management consultancy.

The order, for two 3 m vertical pumps from KPO, was the first Amarinth has won in partnership with ISG, a supplier of equipment for the oil and gas and associated industries based in Kazakhstan.

Part of the company's 10-year plan includes a free cash flow of approximately US$50 billion based on a real WTI price of US$50/bbl and annual capital expenditures averaging less than US$7 billion over the decade.

The new contracts in the Middle East, Africa and Europe are worth approximately US$460 million.

The contracts and contract extensions have a combined value of more than US$120 million.

Group production averaged 79.4 kboepd for the period with high operating efficiency of 94%.

Garcia recently served as Executive Vice President and Chief Financial Officer at Visteon Corporation, a leader in automotive cockpit electronics, and served as a board member of Keane Group, a pure-play provider of integrated well completions.

The rig has been named the "IMI-2030".

Oil and gas production has started at the P-68 FPSO located in BM-S-11-A Concession in Berbigão, Sururu and West Atapu.

The Stena Forth has been contracted to drill one well, being the Marina-1 exploration well, in Karoon’s 40% owned and operated Block Z-38 in the Tumbes Basin in Peru with drilling scheduled to commence early in 1Q20.

The company has announced a major rig fleet expansion programme to support its upstream growth plans and enable the delivery of its 2030 Smart Growth Strategy.