Skip to main content
Oilfield Technology
  • Home
  • News
  • Magazine
  • Webinars
  • Spotlight interviews
  • Events
  • White papers
  • Advertise
  • Get your magazine
Sections
01Drilling & production02Offshore & subsea03Exploration04HSE05Digital oilfield06Hydraulic fracturing07Special reports08Product news
View all news
Latest storyBonaparte CCS project reaches major milestone Bonaparte CCS project reaches major milestone
Latest magazine cover

Inside this issue

The September/October 2026 issue of Oilfield Technology explores how operators and service companies are responding to a more demanding upstream environment through technology, optimisation and smarter decision-making. Highlights include McKinsey & Company on the growing exploration discovery gap, Halliburton on unlocking bypassed reserves through multilateral technology, and MR Group on continuous BOP assurance, alongside features examining autonomous FPSOs, produced water treatment, H2S scavenging, advanced sealing solutions and the growing role of AI in optimising well and asset performance.

More about Oilfield TechnologyIn this issueEditorial commentRegister & Subscribe
From the archive
August 2026June 2026
Browse all issues
Menu
  • Home
  • Drilling & productionOffshore & subseaExplorationHSEDigital oilfieldHydraulic fracturingSpecial reportsProduct news
  • In this issueEditorial commentRegister & SubscribeMagazine archive
  • Webinars
  • Spotlight interviews
  • Events
  • White papers
  • Advertise
  • Contact usAbout usOur teamTerms & SecurityPrivacy policy
  • Get your magazine

News categories

  • Drilling & production
  • Offshore & subsea
  • Exploration
  • HSE
  • Digital oilfield
  • Hydraulic fracturing
  • Special reports
  • Product news

Resources

  • Home
  • Magazine
  • News
  • Events
  • White Papers
  • Webinars
  • Spotlight interviews

Company

  • Contact us
  • About us
  • Advertise with us
  • Our team
  • Terms & Security
  • Privacy policy

Connect with us

Follow us on social media for the latest industry news and updates.

Copyright © 2026 Palladian Publications Ltd. All rights reserved | Tel: +44 (0)1252 718 999 | Email: enquiries@oilfieldtechnology.com

Home/News/Drilling & production

Drilling & production News

Browse the latest drilling & production news and articles.

Block Energy Plc: update on workover operations in Georgia
7 Dec 20184 min read

Block Energy Plc: update on workover operations in Georgia

Block Energy Plc, the exploration and production company focused on the Republic of Georgia, is pleased to provide an update on its initial work programme focused on achieving a 25 fold increase in production at its Norio oilfield to 250 bpd by H1 2019.

Equinor: Wired drill pipe contracts awarded
7 Dec 20183 min read

Equinor: Wired drill pipe contracts awarded

Equinor is stepping up its use of wired drill pipe to acquire subsurface real time data during drilling operations, in line with the corporate digitalisation strategy and to prepare for automated drilling.

ESAI Energy: Peace deal in South Sudan adds another 70 000 bpd of crude to market
7 Dec 20181 min read

ESAI Energy: Peace deal in South Sudan adds another 70 000 bpd of crude to market

As the market eagerly awaits an OPEC+ deal, non-OPEC producers continue to make gains. Sudan and South Sudan are likely to raise crude oil production in 2019, according to ESAI Energy’s recently published Africa Watch.

Tower Resources plc: announces contract for jack-up rig to provide drilling operations at its licence in Cameroon
7 Dec 20182 min read

Tower Resources plc: announces contract for jack-up rig to provide drilling operations at its licence in Cameroon

The Topaz Driller is a Baker Marine Pacific Class 375 jack-up, which was recently mobilised to Cameroon by NewAge as operator for the Etinde license for two appraisal wells and is currently employed in Gabon.

Sparrows signs five-year servicing order with Pemex Procurement International, Inc.
6 Dec 20182 min read

Sparrows signs five-year servicing order with Pemex Procurement International, Inc.

As the original equipment manufacturer (OEM), the first cranes were delivered by Sparrows in the early 1990s to support production in the Kumaza (AS01-02), Abkatun (AS02-03), Litoral (AS02-04) de Tabasco and Cantarell (AS01-01) fields.

Rose Petroleum provides operations update
6 Dec 20182 min read

Rose Petroleum provides operations update

Rose Petroleum plc has provided an update on operations for the Gunnison Valley Unit (GVU) in the Paradox Basin, Utah, USA.

Equinor granted drilling permit for well 35/11-22 S in production licence 248 C
5 Dec 20181 min read

Equinor granted drilling permit for well 35/11-22 S in production licence 248 C

The Norwegian Petroleum Directorate has granted Equinor Energy AS a drilling permit for well 35/11-22 S, cf. Section 15 of the Resource Management Regulations.

Apache achieves first oil at Garten development in UK North Sea
5 Dec 20183 min read

Apache achieves first oil at Garten development in UK North Sea

The discovery well, which is located 6 km south of the Beryl Alpha Platform, was placed on production in late November, less than eight months after being drilled in March 2018.

Equatorial Guinea: oil producers should ‘stand together’
4 Dec 20182 min read

Equatorial Guinea: oil producers should ‘stand together’

Collaboration of Organization of the Petroleum Exporting Countries (OPEC) and non-OPEC producers in committing and adhering to oil production cuts resulted in the historic Declaration of Cooperation in 2017.

Talos Energy announces commencement of Zama appraisal programme
4 Dec 20182 min read

Talos Energy announces commencement of Zama appraisal programme

The spudding of the Zama-2 well marks the commencement of the Zama discovery appraisal programme, which will consist of three reservoir penetrations, including two wells and one sidetrack.

Saudi Aramco awards BHGE major well services contract for conventional fields in Saudi Arabia
4 Dec 20182 min read

Saudi Aramco awards BHGE major well services contract for conventional fields in Saudi Arabia

The three-year contract includes the option of two one-year extensions and the project is expected to commence in December 2018.

Carnarvon: Dorado appraisal drilling update
4 Dec 20181 min read

Carnarvon: Dorado appraisal drilling update

The company has announced that the contract for the Noble Tom Prosser jack-up drilling rig has been secured.

«‹
229230231232233234
›»