
TGS completes reprocessing of new 2D survey in Russian Sea of Okhotsk
First data from the 21 631 km2 regional 2D seismic survey offshore Sakhalin Island has been sent out to pre-funding customers and is now available to all industry customers.
Stay up to date with the latest news and updates from the oil industry.

First data from the 21 631 km2 regional 2D seismic survey offshore Sakhalin Island has been sent out to pre-funding customers and is now available to all industry customers.

TechnipFMC will design, manufacture, deliver and install subsea equipment including subsea production system, flexible flowlines and umbilicals for connection to the Angel platform.

The company has announced a net loss of US$1 billion, or US$1.16 per diluted share, for 1Q20.

The FPSO is currently operating in the OCTP Block, offshore Ghana, and is chartered to Eni.

The Papa-terra field in the Campos Basin is operated by Petrobras, with Chevron holding the other interest.

As shut-ins, reductions in spending and activities weigh in, 4Q20, which was projected to see a y/y oil production increase of 650 000 bpd, is now instead forecast to see a reduction of 1.5 million bpd.

The company has acquired a working interest in the North Kairouan permit and the Sidi El Kilani concession, which contains the Sidi El Kilani oilfield.

Canada will invest CAN$2.5 billion (US$1.8 billion) in measures to help the oil and gas industry during the coronavirus outbreak.

Beach Energy and Diamond Offshore are engaging in discussions with regard to the future operations of the Ocean Onyx rig and the Victorian Otway Basin offshore drilling campaign, with a view to agreeing a new contract in due course.

The project will cover both frontier and mature areas where new broadband seismic is needed to enable the interpretation of the internal reflectors of the main Brent Group reservoir level.

BG International, a subsidiary of Shell, and Aker BP have terminated contracts for the Maersk Developer and the Maersk Reacher respectively.

Nine seismic surveys have been carried out on the Troll field by Equinor and other licensees, with the most recent one completed last summer.