
Buffalo-10 well on course to spud in November
Carnarvon Petroleum’s mid case recoverable volume estimate is 31 million barrels (gross, 2C contingent resource).
Browse the latest offshore & subsea news and articles.

Carnarvon Petroleum’s mid case recoverable volume estimate is 31 million barrels (gross, 2C contingent resource).

Project Haldane is set to develop an industrial scale offshore green hydrogen production concept, through the deployment of an electrolyser system on a converted jack-up rig.

Lasting nearly 2 months, the approximately 890 km2 survey for Beach Energy will be conducted by the Geo Coral.

Subsea 7’s scope includes the engineering, procurement, construction, and installation of the subsea flowline system as well as the installation of OneSubsea’s multiphase compression system.

TMC’s marine compressed air system for the Woodside Sangomar FPSO will consist of large capacity service and instrument air compressors with associated air dryers and filters.

The project, for an unnamed company, will commence in early October 2021 and last approximately 1 month.

Valaris jack-ups have been contracted for work offshore the Netherlands, the UK North Sea and offshore Timor-Leste.

The new agreement will see Prism Energy provide risk management systems and consultancy services which will be used across the production company’s decom projects, operational assets and new development projects.

A comprehensive damage assessment of the West Delta-143 (WD-143) offshore facilities from Hurricane Ida has revealed significant structural damage.

Matapal will deliver gas into the Trinidad gas market from resources discovered by the Savannah exploration well, drilled in 2017.

Production permits for the Oseberg and Troll fields have each been increased by 1 billion m3 for the gas year starting 1 October.

The Augmented Machine Vision Solution is designed to inspect critical industrial equipment, particularly for subsea oil and gas infrastructure.