
BHP awards McDermott contract for Trion FPU pre-FEED design
The pre-FEED scope includes engineering tasks related to the configuration, sizing and preliminary analysis of the FPU, including topsides, hull, risers and mooring.
Browse the latest gulf of mexico upstream news news and articles.

The pre-FEED scope includes engineering tasks related to the configuration, sizing and preliminary analysis of the FPU, including topsides, hull, risers and mooring.

The project in the Mexican sector of the Gulf of Mexico is scheduled to commence in 3Q20 and will take approximately 60 days.

The contract includes work for the Anchor project in the US Gulf of Mexico.

The Gulf of Mexico operator will deploy DiscoveryTM, Tracerco’s Subsea CT Scanner, to obtain critical baseline integrity data on the new pipeline system.

A total of 22 companies participated in Lease Sale 254, submitting US$108 587 185 in total bids.

By sidetracking from a collapsed expandable liner, the re-entry operation eliminated the time and cost associated with re-drilling and re-casing a 3000-ft hole.

BW Offshore has signed a five-year contract for the lease and operation of the BW Pioneer FPSO on the Cascade and Chinook fields on behalf of MP Gulf of Mexico.

The project will be Shearwater’s first OBS remotely operated vehicle survey.

The second phase of the companies' ultra-long offset node project will extend the footprint of ultra-long offset data to the Northern Green Canyon protraction area.

The company has been awarded contracts by ConocoPhillips Australia Barossa and Murphy Exploration and Production for work at the Barossa project and at the Samurai, Khaleesi, and Mormont developments respectively.

Wood is delivering an engineering design project for Chevron’s Anchor deepwater development in the Gulf of Mexico.

The order includes the design, engineering and manufacturing of a riser isolation valve control system as well as other subsea production equipment.