
Neptune Energy begins drilling Calypso exploration well
The reservoir target is the middle and lower Jurassic formations and is expected to be reached at a depth of approximately 2960 m.
Browse the latest north sea oil news news and articles.

The reservoir target is the middle and lower Jurassic formations and is expected to be reached at a depth of approximately 2960 m.

AGR, a multi-disciplinary engineering consultancy and software provider, is to expand and grow its range of services with the opening of an office in Oslo, Norway, to meet increased demand from new projects coming online in the oil and gas and renewables sectors.

The contracts will take effect before the end of 2022, have a three-year firm period, and three one-year options. The vessels will support Equinor’s activities on the Norwegian Continental Shelf.

The licensing round highlights four priority cluster areas in the Southern North Sea (Greater Pegasus Area, Greater West Sole Area, Greater Cygnus Area and Cotton Area).

95% supported strike action in a ballot turnout of 86% after Unite accused oil and gas companies of ‘unfettered profiteering.’ The strike action will involve a series of 48-hour stoppages every second week for the first 8 weeks and will start on 20 and 21 October.

The contracts are part of a longer-term Alliance Agreement with CHC which will enable Neptune and CHC to optimise flight scheduling and route planning, and reduce the total number of offshore flights.

PGNiG and Equinor ASA group companies have concluded gas sales agreements for natural gas from the Norwegian Continental Shelf.

The contract covers pipelay for a 30 km tieback from the new Jackdaw platform to Shell’s Shearwater platform, as well as an associated riser, spoolpieces, subsea structures, and umbilicals.

Well-Safe Solutions’ Well-Safe Protector jack-up rig will carry out the plug and abandonment of at least four subsea and 17 platform wells located in Dutch and UK waters.

The contract, which builds on a relationship with Serica Energy which began in 2018, was enhanced in 2019 to include metering engineering services through the deployment of dedicated onshore and offshore personnel.

Tendeka has signed a new multi-year contract extension to exclusively deliver standardised sand-face completion equipment across all Equinor’s assets on the Norwegian Continental Shelf. The agreement will see Tendeka manage the complete supply chain of sand and inflow control equipment through standardisation.

Serica’s net well cost after tax is anticipated to increase by approximately £3 million as a result of the delays and it is now expected that results from the well will be available in December 2022.