
Shelf Drilling receives extension for Trident XIV jack-up rig
The Trident XIV Jack-up rig is undertaking workover operations offshore Nigeria.
Browse the latest oil & gas news news and articles.

The Trident XIV Jack-up rig is undertaking workover operations offshore Nigeria.

Ocean Infinity will be deploying technology to conduct 2D Ultra High-Resolution Seismic surveys and Seabed Soil Sampling in Block 32 and Block 17.

The agreement between ERU and PGNiG provides for joint operations on a licence located in the Lviv region, which is close to the Polish border.

The fire-resistant RADOX® OFL (Oil & Gas Flexible Lightweight) cable solution provides the offshore industry with a safe way to reduce platform weight.

Petrofac has been appointed by Maersk to deliver well management services, including project and supply chain management support for shallow water and deepwater wells throughout the duration of the programme.

Total will finance contributions of US$70 million at the outset, US$30 million when the North Gialo field will come onstream and US$30 million when the NC 98 field will come onstream.

In the upstream business, approximately US$11 billion is forecasted to sustain and grow currently producing assets, including about US$4 billion for Permian unconventional development and about US$1 billion for other international unconventional development.

The acquired fields, which are mostly operated by Equinor, will add additional daily production of approximately 150 000 bpd for the company, which is owned by Eni and HitecVision.

Dave McKendrick, Baker Hughes, demonstrates how industry partnership models are marking a new era for extending life of field.

The contract will see Aker Solutions deliver front-end engineering and design (FEED) for the first platform in a potential series of future assets within BP’s Trinidad and Tobago (BPTT) portfolio.

The survey was performed in August in water depths of 600 m using the Fugro Equator, a dedicated geophysical survey vessel, and the Fugro ES-V AUV, and completed with zero HSSE incidents.

The winning bids commit the company to an exploratory work programme, including geological studies, seismic and wells over a three-year phase (Phase 1) on each of the exploration contracts.