
Petrobras starts up Sépia field production
The FPSO Carioca has started producing oil and natural gas from the field, located in the Santos Basin.
Browse the latest upstream news news and articles.

The FPSO Carioca has started producing oil and natural gas from the field, located in the Santos Basin.

The Luda 6-2 oilfield is expected to reach its peak production of approximately 10 000 bpd in 2022.

Frontera Energy Corp. and CGX Energy expect the Kawa-1 well to reach total depth in the first half of December 2021.

ADNOC has signed framework agreements with AMEC International Ltd, Fluor, McDermott, Mott MacDonald, SNC-Lavalin International Arabia Limited – Abu Dhabi, Technip Energies, Worley, and a joint venture between Tecnicas Reunidas and NPCC.

The acquisition includes approximately 8400 boe/d (51% oil and NGLs) of predictable low-decline production and 79.5 million boe of 2P reserves.

PGS has completed a survey of the Kraken field, operated by EnQuest.

The contract awarded by Santos will commence with full definition engineering by Altera to confirm the technical requirements for the FPSO and associated disconnectable mooring system.

Worley will provide detailed engineering, design, and construction management services for the project’s power transmission and communication components.

Duva is the third field involving Neptune Energy to be brought online this year, following Gjøa P1, also offshore Norway, in February and Merakes, offshore Indonesia, in April.

The sister FPSOs P-78 and P-79, currently under construction for Petrobras, are due in service in 2025.

The survey will be executed during 3Q21 for a multi-client company.

The drilling programme relates to the drilling of a wildcat well in production licence 882.