
Construction of ice-resistant platform for Gazprom gas field begins
The platform is being constructed in the Kamennomysskoye-Sea gas field, located in the Ob Bay of the Kara Sea.
Browse the latest upstream project news news and articles.

The platform is being constructed in the Kamennomysskoye-Sea gas field, located in the Ob Bay of the Kara Sea.

The company will continue to support the offshore operations of an international oil and gas company in Brunei.

The FPSO operating the well has the capacity to process up to 150 000 bpd and treat up to 6 million m3 of natural gas.

The three-year contract began on 1 May and will employ 144 Danos personnel in a variety of positions.

Zenith has ceased all oil production operations in Azerbaijan and all field production personnel, approximately 170 employees, have been transferred to a division of SOCAR.

TWI and DNV GL are aiming to address the significant challenge of corrosion in downhole tubing and casing applications in the oil and gas industry.

The new phase of the project, based on the successful completion of a design study last year, will include the design, build and test of enabling technologies that are the backbone of Upwing’s Magnetic Drive System concept for a reliable and retrievable electric submersible pump.

Efforts to find an additional partner for the drilling of the next well in blocks A2 and A5 are ongoing, with FAR working to conclude a farm-out before the restart of the drilling operations.

The platform enabled the customer to automate production monitoring, analysis, and optimisation asset-wide for 1700 electric submersible pump wells.

The field will be redeveloped by installing a new wellhead platform tied in to the Valhall field centre.

Neptune Energy have announced the safe removal of the L10-C, L10-D and L10-G platforms from the Dutch sector of the North Sea.

FAR is investigating selling all or part of its interest in the project.