
Shearwater to carry out North Sea 4D survey for Apache
The survey will be carried out in the Forties field by the Amazon Warrior.
Browse the latest upstream project news news and articles.

The survey will be carried out in the Forties field by the Amazon Warrior.

Well 35/10-6, in production licence 827 S, has been permanently plugged and abandoned.

Aquaterra Energy will design a new single well conductor supported platform for DeNovo Energy, to be located in the Zandolie field.

Under the company’s Fast4Ward programme the total number of hulls ordered to date stands at five, with three allocated to projects.

The new class notation IVBS-BRA developed by Bureau Veritas will help clients to demonstrate compliance with Brazilian regulations for operating FPSOs and FPUs in the country's deepwaters.

The survey took place in water depths of 750 to 3500 m and is Nigeria’s first regional multi-client multibeam and seafloor sampling (MB&SS) study.

Petrobras is revising all exploration and production projects as a result of its new oil pricing assumptions.

The company is targeting additional savings to those in April, and now expects to reduce overhead and project support costs by at least US$125 million in 2020 and by up to US$200 million in 2021.

The guidelines aim to help companies understand good practice in how to identify, rank, approve and carry out opportunities to optimise production.

The company recently engineered a pair of ROV-deployable magnetic mounts to allow the loggers to be mounted directly onto subsea cross braces on a platform at two separate depths.

A Rystad Energy analysis shows that gross US cuts could reach at least 2 million bpd in June, including liquids.

12 prospective parcels of land will be opened for tender across Queensland’s resource-rich Bowen and Surat basins between Blackwater and Goondiwindi.