
Murphy Oil achieves first oil at deepwater Gulf of Mexico project
Production has begun flowing through the Murphy-operated King’s Quay floating production system.
Browse the latest upstream project news news and articles.

Production has begun flowing through the Murphy-operated King’s Quay floating production system.

EnerMech has won two contracts in Azerbaijan since entering a new JV with Oil & Gas Proserv, an affiliated company of Nobel Energy Group.

Hunting’s Direct Pull-Through installation methodology is intended to simplify installation and enhance safety during project execution.

The Jade prospect has a GCA audited mean in place potential of 225 million bbl and a P10 in place upside of 395 million bbl.

Aker BP, which operates the field, and partner Pandion Energy expect Hod to produce 40 million barrels of oil.

The harsh environment jack-up rig Maersk Resolute will be employed to plug and abandon a total of 31 wells in the Dutch sector of the North Sea.

Siemens Energy will supply both the power generation and compression packages for the Petrobras-operated P-78 FPSO.

Gas production will be doubled from the Duva field in the North Sea, enabling an increase of 6500 boe/d from the first half of April.

Equinor and partner Cenovus Energy have not yet made a final investment decision on whether to build the Bay du Nord offshore project.

Cervantes-1, an oil exploration well in the onshore Perth Basin licence L14, failed to encounter hydrocarbons.

Cloudbreak Discovery, Gondwana Petroleum Namibia Pty Ltd., Timeworn Investments Pty Ltd., Pioneer Oil and Gas Consulting CC and a Swiss-based asset manager will jointly work towards submission of an application to acquire Petroleum Exploration License 1724 in Namibia.

Valued at approximately US$60 million, the 60-month contract encompasses services and expertise to support Cairn’s Mangala Processing Terminal located in Rajasthan, India.