
Rystad Energy predicting upstream renaissance for the UK offshore sector
Rystad Energy expects a new wave of UK field development projects to be sanctioned towards 2022.
Browse the latest upstream project news news and articles.

Rystad Energy expects a new wave of UK field development projects to be sanctioned towards 2022.

The partnership involves Eigen building process system monitoring, equipment performance monitoring and condition monitoring displays for Chrysaor’s critical mechanical and process equipment.

The Obiafu-41 Deep well is anticipated to deliver in excess of 100 million ft3/d of gas and 3000 bpd of associated condensates.

The work scope includes the transport, installation and pre-commissioning of 35 km of flexible pipelines and 20 km of umbilical, connecting 5 wells to the floating production storage and offloading (FPSO) vessel Cidade de Caraguatatuba.

The offshore phase commenced last month following the completion of ongoing decommissioning work at the Leadon field.

A joint industry project led by the company has led to the development of the ODIN diverless alternative for use on floating assets.

The company will provide the supermajor with a 4 km, 7.1 in. inner diameter (ID), 160 bar design pressure TCP Flowline for water injection replacing existing corroded flowlines in the field.

The licenses were given to INA, Vermilion Energy, Aspect Croatia and Crodux Derivati.

The vessel will operate in the Stabroek Block, which is operated by ExxonMobil affiliate Esso Exploration and Production Guyana Ltd.

The agreement, which has been terminated as of 29 August 2019, was for the Lake Albert licences in Uganda.

The company is to drill an appraisal well at the Birgitta field in the Central part of the UK North Sea.

Over the course of the 30-day campaign, the company's E1000 system enabled more than 1925 safe personnel transfers and 354 lifts, transferring 118 t of cargo.