
MOL Norge given drilling permit
The drilling programme for well 2/9-6 S relates to the drilling of a wildcat well in production licence 617, about 31 km east of the Valhall field.
Browse the latest upstream project news news and articles.

The drilling programme for well 2/9-6 S relates to the drilling of a wildcat well in production licence 617, about 31 km east of the Valhall field.

Denmark has cancelled its latest licensing round and put an end date of 2050 on all oil and gas exploration and extraction in the North Sea.

Rystad Energy is forecasting peak oil demand to arrive earlier and at a lower level than previously thought, leading to reduced E&P investments.

FAR has a 13.67% interest in the Sangomar exploitation area.

Separo will continue to provide water treatment services at the Cygnus Alpha gas production platform.

The survey will provide the first 3D seismic data over blocks offered in Brazil's 17th Bidding Round, now scheduled for October 2021.

The contract was awarded to BGP Inc., a subsidiary of China National Petroleum Company (CNPC).

To date, the storage tanks and inspection gantry have been installed at the Wressle oilfield in North Lincolnshire, UK, while work is advanced in respect of the electrical and control system installation.

Genel Energy has announced first oil production from the Sarta field in Iraqi Kurdistan.

First images from the OBN Cornerstone 2020 multi-client survey are being made available in early 2021.

The company has secured a contract from a repeat customer for the fabrication and integration work on a FPSO.

The survey will take place over the Jubarte field in the Campos Basin.