
CNOOC begins production at Liaodong Bay oilfield
The Jinzhou 25-1 oilfield 6/11 area is expected to reach peak production of approximately 16 500 bpd in 2023.
Browse the latest upstream project news news and articles.

The Jinzhou 25-1 oilfield 6/11 area is expected to reach peak production of approximately 16 500 bpd in 2023.

Wintershall Noordzee is currently finalising the hook-up activities to the D12-B production platform, from where the produced gas will be transported via the Neptune Energy-operated D15-A production platform, through the NGT gas transportation system to shore.

The contract covers the delivery of four subsea templates and up to 23 subsea trees and associated components.

The Santos-operated field is located in Permit WA-33-R off the coast of Western Australia.

Neptune Energy will remain as operator of the prospect with a 30% working interest in the licence.

The contract covers the provision of platform drilling operations and maintenance services on Beryl Alpha and Bravo, Forties Alpha, Bravo, Charlie and Delta in the UK North Sea.

First images from the Central North Sea survey are targeted for 1Q21.

Hydrocarbons have been identified in the pioneer well of block C-M-657, located in the pre-salt of the Campos Basin.

Equinor’s subsea gas-compression system at Åsgard, Norway reached the milestone on 17 September 2020.

Aker Solutions will engineer a high-voltage electrical boiler package as part of the electrification of Lundin Energy's Edvard Grieg platform.

The study will examine specific economic parameters used by BOEM and BSEE for new and high-cost technologies like extended-reach subsea tiebacks.

The contract will start in 4Q20 with an expected duration of about three months.